B20 · AI · 8–12 WEEKS · BUILD

Platform, governance,
first agents live.

B20 · No-Code Agent Platform Implementation implements a governed no-code agent platform end-to-end in 8–12 weeks — from vendor-neutral platform selection through 1–3 production agents delivered under the governance overlay. Not a licence purchase. A working platform your citizen developers can ship into.

DURATION
8–12 wks
DELIVERABLES
5 named
COMMERCIAL
Fixed fee
B20·PROJECTION / AGENTS LIVE
B20
BEFORE
0
AGENTS LIVE · NO PLATFORM
B20
AFTER
3
AGENTS LIVE · GOVERNED PLATFORM
WK 00
WK 03
WK 07
WK 10
STEADY
STREAMS
6
AUDIT COMPLETENESS
100%
AGENTS SHIPPED
1–3
SCENARIO · UAE GOVT FEDERAL MANDATE · N=1
ILLUSTRATIVE
§ 00 · THESIS
01
WHY PLATFORM-FIRST,
NOT AGENT-FIRST.

The failure mode is predictable and we have watched it happen at enough clients to name it precisely. A department stands up one agent on a no-code tool because it demoed well. Then another department does the same, on a different tool, with different credentials and no shared audit trail. Within a year IT is holding thirty ungoverned agent experiments and a backlog they cannot service, and nobody can answer the one question a regulator will ask first: who approved this agent to take this action.

The fix is not to ban no-code agents — the productivity case for citizen-developer agent building is real. The fix is to build the platform and the governance overlay before the second agent ships, not after the thirtieth. B20 selects a platform on evidence, wires identity, RBAC, and audit logging into its foundation, and only then builds the first 1–3 production agents on top of it. Agent-first gets you a demo. Platform-first gets you a place to put the next fifty.

STATE · UNGOVERNED
Departmental agent experiments, no shared platform, no governance overlay, IT backlog growing unserviced.
STATE · OPERATIONAL
Governed platform live. First 1–3 agents shipped, audited, business-owned. Citizen developers building on a foundation, not around one.
§ 01 · WORK STREAMS

Six streams,
ending in 1–3 shipped agents.

Platform evaluation and foundation build front-load weeks 1–4. Integration and the governance overlay overlap through weeks 3–9. First agents and compliance handover close weeks 6–12.

STREAM 01
WK 01–02

Platform evaluation & selection

Vendor-neutral scorecard run against your readiness assessment, existing stack, sovereignty requirements, and integration needs. Selection signed before Stream 02 begins.

STREAM 02
WK 02–04

Foundation build

Identity, RBAC, secrets management, audit logging, and observability wired in from day one — the scaffolding every agent built afterward inherits.

OUTCOME
1–3
PRODUCTION AGENTS SHIPPED
+ GOVERNED PLATFORM
STREAM 03
WK 03–06

Enterprise integration

ERP, CRM, ITSM, ticketing, and identity provider connectors within scope, built against the platform's gateway rather than point-to-point.

STREAM 04
WK 05–09

Governance overlay

Approval gates, evaluation harnesses, drift monitoring, and deployment limits — built into the platform, not offered as a configuration option a citizen developer can skip.

STREAM 05
WK 06–10

First 1–3 production agents

Built from the A11 readiness backlog, tested through UAT with the named business owner for each agent, and cut over on an agreed date.

STREAM 06
WK 11–12

Compliance evidence & handover

PDPL/ADHICS/AI Charter evidence pack assembled, operator training delivered, and 30/60/90-day post-handover check-ins scheduled.

EXPLICITLY NOT COVERED
Ongoing platform operations and agent lifecycle support
after handover. That's C9 Managed Agent Operations.
Training and certifying business-unit citizen developers
to build their own agents on the platform. That's B22 Citizen Developer Programme.
§ 02 · TIMELINE

Twelve weeks maximum.
Eight minimum. Four phases.

Phase count is fixed. Duration flexes with platform procurement lead-time and integration count. Milestones are signed gates — not aspirations.

WK 0102030405060708091011 · 12Phase 1 · Platform selection & foundationPhase 2 · Integration & governancePhase 3 · First agents & UATPhase 4 · HandoverPlatform selected & foundation builtEND WK 04 · GATE 01Integration & governance overlay liveEND WK 07 · GATE 02Agents in productionEND WK 11 · GATE 03Handover completeEND WK 12 · GATE 04OPERATING RHYTHMDaily standup · Weekly sponsor check-in · Bi-weekly Practice Lead reviewNAMED ACCOUNTABILITYPractice Lead — AI (CEO escalation available)
§ 03 · APPROACH

Platforms scored,
not on analyst-quadrant position.

Every platform decision runs a six-criteria scorecard in weeks 1–2. Each criterion scored 1–5 against evidence — analyst reports are read but never the final word. Signed by your IT lead before Phase 2 begins.

NO-CODE AGENT PLATFORM SELECTION SCORECARD · TEMPLATE
CRITERIA · 06 · WEIGHTED 1–5
ILLUSTRATIVE SAMPLE RENDERING — actual scores are engagement-specific and derived from evidence gathered during discovery.
01
Platform vendor-neutrality and lock-in exposure
How much of your agent logic, data, and integrations are portable if you switch platforms in three years. Proprietary formats score low regardless of feature depth.
4/5
02
UAE data residency and sovereignty options
In-country hosting or sovereign-cloud deployment options for agent data, logs, and model calls — a hard requirement for several government clients before feature evaluation even starts.
4/5
03
Native governance primitives
Approval gates, audit trails, and role-based publishing built into the platform, not bolted on through custom middleware that fails silently under load.
5/5
04
Integration ecosystem depth
Pre-built connectors to the ERP, CRM, and ITSM systems in scope, measured against custom-integration effort required for the gaps.
4/5
05
Three-year TCO at realistic agent volume
Licence cost plus integration effort plus governance overhead, modelled against the agent count you actually expect to run — not the vendor's headline seat price.
3/5
06
Citizen-developer path
Whether the platform supports a graduated permission model suitable for onward [[B22|B22 Citizen Developer Programme]] alignment, rather than an all-or-nothing developer console.
3/5
!
DISCLOSURE · VENDOR-NEUTRALITY
NexITC maintains commercial arrangements with several no-code agent platform and integration vendors — these are how specialist consultancies build sustainable practices. We do not disclose which arrangements exist publicly because we do not want them to influence platform choice by anyone reading this page. The scorecard exists precisely so selection happens on evidence, not on economics. In practice, we have recommended platforms with which we have no partnership when the scorecard result favoured them.
§ 04 · ARCHITECTURE

From agent-by-agent
to governed platform.

A typical pre-engagement state has ad-hoc agent experiments scattered across departments — no shared platform, no governance, an IT backlog growing behind a team too small to clear it. The engagement replaces the scatter with a single governed platform and a first wave of shipped agents.

BEFORE · T=0
TYPICAL STATE
TOOL_01
Departmental agent trial #1
UNGOVERNED
TOOL_02
Departmental agent trial #2
DIFFERENT VENDOR
TOOL_03
Shadow automation scripts
AD HOC
TOOL_04
No shared audit trail
UNATTRIBUTABLE
IT BACKLOG
30+ departmental agent requests queued behind a 6-person team
OPERATIONAL REALITY
  • No shared platform, no shared governance overlay
  • Each department building on a different tool
  • No consolidated audit trail across trials
  • IT backlog growing faster than the team can clear it
B20 · IMPLEMENT
AFTER · STEADY STATE
TARGET-STATE
PLATFORM_01
No-Code Agent Platform
Registry · Gateway · Governance Overlay
PLATFORM_02
First-Wave Agents
1–3 Shipped · Audited · Business-Owned
↓ GOVERNED · AUDITED · BUILT ONCE, REUSED ↓
INTEGRATIONS · RETAINED
Wired through the gateway
STEADY-STATE OUTCOME
  • Single governed platform, one audit trail
  • 1–3 production agents live, business-owned
  • Approval gates enforced by default, not by configuration choice
  • Backlog now has a platform to ship into

Reference pattern. Some engagements retain an existing agent trial as one of the first three production agents once it passes the governance overlay. What always gets built new is the platform foundation and governance overlay. Never the underlying business systems the agents call into.

§ 05 · REPRESENTATIVE SCENARIO

A government first-wave,
shipped.

Representative pattern for a UAE government entity under a federal AI-adoption mandate, with three candidate use cases identified through prior readiness discovery. Ranges reflect target outcomes NexITC underwrites in scope for this class of engagement. N=1 — illustrative composite, not a specific client.

SCENARIO / B20 / UAE GOVT · 3 USE CASES
DURATION · 11 WKS
PRODUCTION AGENTS
3
Shipped from the A11 readiness backlog
AUDIT COMPLETENESS
100%
Every action attributable at handover
ADDITIONAL QUEUED
2
Candidate use cases queued for the next wave
SITUATION

UAE government entity under a federal AI-adoption mandate, with three candidate use cases surfaced through prior A11 Agentic AI Readiness & Use-Case Discovery work but no platform, no governance overlay, and no shipped agents.

ENGAGEMENT

11-week B20. Weeks 1–4 platform selection and foundation build. Weeks 3–7 enterprise integration and governance overlay running in parallel. Weeks 6–10 first agents built and UAT'd against the three candidate use cases. Handover across weeks 10–11.

OUTCOME

All three candidate agents shipped to production, business-owned, and audited against the governance overlay. Two additional use cases identified during discovery queued for the entity's next wave, ready to build on the platform now in place.

§ 06 · DELIVERABLES

Five artifacts,
each with signed acceptance.

Every deliverable has documented acceptance criteria signed at engagement kickoff. Nothing more, nothing less.

D_01

Platform Selection Scorecard

Six-criteria evaluation signed by IT leadership, with documented evidence behind every score.

D_02

Platform Foundation Build

Identity, RBAC, secrets management, audit logging, and observability wired and tested.

D_03 · CORE

Enterprise Integration

ERP, CRM, ITSM, ticketing, and identity provider connectors, built through the platform gateway.

D_04

Governance Overlay & Compliance Evidence Pack

Approval gates, evaluation harnesses, drift monitoring, deployment limits, and the PDPL/ADHICS/AI Charter evidence pack.

D_05 · SHIPPED

First 1–3 Production Agents

The agents that prove the platform works with your workflows, not vendor demos — built, UAT'd, and handed over with operator training.

HANDOVER
WK 12
§ 07 · OUTCOMES

Six outcome metrics,
measured pre and post.

Success is not “the platform is licensed.” It is measured against six specific outcomes captured in a baseline report at engagement start and re-measured at steady state.

THE PRODUCTION AGENTS JOURNEY · REPRESENTATIVE
Zero to three production agents, across the four phases.
3PRODUCTION AGENTS
432100BaselinePRE-ENGAGEMENT1First agent shippedEND WK 072Second agent shippedEND WK 093Steady state30 DAYS POST
01 · AGENTS LIVE
1–3
Production agents live at handover, built from the A11 readiness backlog.
02 · TIME-TO-FIRST-AGENT
≤8wks
Elapsed time from kickoff to first production agent cut over.
03 · AUDIT COMPLETENESS
100%
Every logged agent action attributable to an approval or a named owner.
04 · GOVERNANCE GATE PASS RATE
95+%
Approval gate and evaluation harness pass rate across shipped agents.
05 · OPERATOR HANDOVER
Signed
Operator acceptance of runbooks, training, and the compliance evidence pack.
06 · CITIZEN-DEVELOPER READINESS
Prepared
Platform permission model and onboarding path ready for onward B22 alignment.
§ 08 · FIT

Honest scoping.

B20 is a fit when specific conditions are met. It is not a fit when other conditions are. We say so before the scope conversation, not after the commercial commitment.

PREREQUISITES
Move fast when these five conditions are in place at kickoff.
01
Readiness assessment complete

A11 or an equivalent discovery exercise has already surfaced candidate use cases. Without it, Phase 1 has nothing concrete to build the first agents against.

02
1–3 candidate use cases

Named and scoped, not a general ambition to “do agents.” The platform selection scorecard is graded against real workload, not a hypothetical one.

03
IT/platform team as counterpart

A named counterpart who owns identity, RBAC, and integration decisions alongside us — this is not a hands-off procurement.

04
Business owners for each candidate agent

Someone accountable for UAT and sign-off on each of the 1–3 agents shipped in Stream 05.

05
Executive sponsor

Available for bi-weekly reviews and empowered to approve the platform decision once the scorecard is signed.

NOT SUITABLE IF
Four patterns indicate a different engagement is a better fit.
No use cases identified yet

Start with A11 Agentic AI Readiness & Use-Case Discovery.

Want custom-coded agent, not platform

For one bespoke agent without onward self-service, look at B14 Agentic Workflow Agent Build™.

Want sovereign-cloud platform

Sequence B21 Sovereign AI Platform Build alongside B20 when the platform itself must run inside a sovereign boundary.

Regulatory deadline is under 6 weeks

Eight weeks is our minimum for a defensible governance overlay. We will not compress safety testing to hit a shorter deadline — the gate stays, or the timeline moves.

§ 09 · COMMERCIAL

Fixed fee.
Milestone-based.

Total engagement fee agreed in the scope statement. Not time-and-materials. Not day rate. Every engagement is preceded by a scope conversation to ensure fit before commitment.

STANDARD MODEL
ENGAGEMENT MODEL
Fixed fee
PAYMENT CADENCE
Milestone-based

Payment schedule aligned to engagement phases and defined delivery milestones agreed upfront.


INCLUDED IN SCOPE
  • All 5 named deliverables with acceptance criteria
  • Named Practice Lead throughout the engagement
  • Bi-weekly executive sponsor reviews
  • 30/60/90-day post-handover check-ins
  • Written scope amendment process for any changes
01

Signed scope statement

Every engagement begins with a signed scope statement fixing deliverables, timeline, milestones, and commercial terms. No verbal agreements. No moving targets.

02

No scope creep

Scope changes require a signed scope amendment. If scope changes, so does the commercial arrangement — always in writing, always signed by both parties.

03

Named accountability

The Practice Lead is accountable for commercial and delivery outcomes throughout the engagement, with escalation to the CEO within 24 hours if needed.

§ 10 · QUESTIONS

Five, most asked.

Q_01Are you tied to a specific agent platform?
No. Platform selection runs the same evidence-based scorecard as any other decision we make on a client's behalf — vendor-neutrality and lock-in exposure, UAE data residency, native governance primitives, integration depth, three-year TCO, and citizen-developer path, each scored 1–5 against evidence gathered during discovery. We have delivered on multiple no-code agent platforms and have no standing preference. Vendor-neutral is a scorecard, not a slogan, and the disclosure on our vendor arrangements is published in the approach section of this page.
Q_02What if we already have an agent platform in place?
The engagement adapts. Stream 01 becomes a fit assessment against your existing platform rather than a fresh selection, and we tell you plainly if the platform doesn't hold up under the scorecard. If foundation work — identity, RBAC, secrets management, audit logging, observability — isn't already in place, Stream 02 still runs in full. The governance overlay in Stream 04 is built regardless of which platform is already licensed; most platforms ship without one.
Q_03How is this different from B14 Agentic Workflow Agent Build™?
B14 Agentic Workflow Agent Build™ delivers one custom-coded agent with a bespoke control plane for a single structured workflow. B20 delivers a platform — the registry, gateway, and governance overlay a citizen-developer team ships agents into — plus the first 1–3 production agents built on it. If you need exactly one agent and no onward self-service capability, B14 is the leaner engagement. If you expect a pipeline of agents beyond the first, B20 is the one that scales without rebuilding the control plane each time.
Q_04How does governance work in production?
The governance overlay — approval gates, evaluation harnesses, drift monitoring, deployment limits — is built into the platform during the foundation stream, not bolted on after agents are already live. Every agent that ships in Stream 05 inherits the overlay by default; there is no configuration path that lets a citizen developer publish an agent without an approval gate on consequential actions. That is the difference between a governed platform and a licence with a compliance policy attached to it.
Q_05What comes next?
Depends on the scaling direction. If the next step is operating and monitoring the agents already shipped — drift checks, safety-test cadence, lifecycle support — that's C9 Managed Agent Operations. If the next step is widening who can build on the platform, B22 Citizen Developer Programme trains and certifies business-unit developers against the governance overlay B20 already built. Most engagements end up needing both, in sequence.
§ 11 · NAMED ACCOUNTABILITY

One name
on the engagement letter.

A named Practice Lead is accountable for delivery, commercial outcomes, and the client relationship throughout the engagement. Not a project manager who disappears after kickoff. Not a partner who nods at the SOW and vanishes.

THE ROLE

Practice Lead — AI

Present at every phase gate, every scope decision, every difficult conversation. Available for 30/60/90-day post-handover check-ins as part of the engagement.

SIX ACCOUNTABILITIES
01
Commercial arrangement

Including scope amendments.

02
Deliverables acceptance

Signs off all 5 deliverables.

03
Bi-weekly reviews

With executive sponsor.

04
Change orders

Authorised to negotiate.

05
Escalation path

CEO within 24 hours.

06
Post-handover

30/60/90-day check-ins.

§ 13 · BOOK A CLINIC

Thirty minutes.
No slide deck.

A structured 30-minute scope conversation with the Practice Lead. You describe the candidate use cases, the systems they touch, and who owns each one. We describe whether B20 is the right engagement — and if not, what is.

Book a clinic →Email directly
DURATION
30 minutes
PREPARATION
None required
FOLLOW-UP
Written scope, 5 business days